:-Hi Expert,
Here we are using two schema in Time Evaluation.
1.ZQTA (its run calendar year)
2.ZSJK(Its run on payroll period which is 21st of previous month to 20th of next month)
How system is determining to different period for two different schema?
Now problem is coming that after run ZQTA when we are running schema ZSJK, IT2006 is showing zero value
:-In table T559L check the quota type whether the increase button is clicked or not. This speaks whether that particular quota should generate in pt60.
Also i dont understand why you need to different schema. Why can't you club the both in same schema and run as per you requirement.
Regards,
Niranjan
:-HI Niranjan,
Thanks for your reply. Mentioned table is properly maintained.
But I don't know how to club this two schema in one schema. can you help me
to do this?
Now problem is coming that after run quota generation schema when we are
running schema(which is related to payroll) then all quotas in IT2006
becomes zero.
waiting your positive reply.
Regards,
Sankarsan
:-What Niranjan is saying that you club the functionalities of both schemasin one schema. This means let us say you want to go with ZQTA, then take the custom PCRs created in ZSJK and insert them in the appropriate place in ZQTA. That way only 1 schema will be used, which is the best practice.
First figure out why the need for 2 schemas. This will give you inputs when merging the schemas.
:-Hi PKverma,
Here payroll integration is present so I think I have to club ZQTA to ZSJK.
But I am not understanding how I will club this two.
Please advise.
Regards,
Sankarsan
:-Hi Sankarsan,
I have faced the same issue when you have positive time management and if
you use ZQTA (copy of TQTA) Then once you run the ZQTA , the quota will
generate properly and but the problem is that when you run the normal time
schema, the quota will become zero in IT2006.Also again if you run with
ZQTA, the system will properly calculate the Quota and same is available
with IT2006.
There is no solution for this problem as i have checked with ABAPer and
gone through the standard programand also checked with SAP. i was not
getting any solution. i have done the same thing what Mr.Niranjan has
already mentioned.
So you need to include all the PCRs mentioned in the schema ZQTA to your
schema ZSJK exactly the place where the Quota function is used.
The problem will get resolved.
Please try the same and let us know the result.
Thanks
Rajini
Here we are using two schema in Time Evaluation.
1.ZQTA (its run calendar year)
2.ZSJK(Its run on payroll period which is 21st of previous month to 20th of next month)
How system is determining to different period for two different schema?
Now problem is coming that after run ZQTA when we are running schema ZSJK, IT2006 is showing zero value
:-In table T559L check the quota type whether the increase button is clicked or not. This speaks whether that particular quota should generate in pt60.
Also i dont understand why you need to different schema. Why can't you club the both in same schema and run as per you requirement.
Regards,
Niranjan
:-HI Niranjan,
Thanks for your reply. Mentioned table is properly maintained.
But I don't know how to club this two schema in one schema. can you help me
to do this?
Now problem is coming that after run quota generation schema when we are
running schema(which is related to payroll) then all quotas in IT2006
becomes zero.
waiting your positive reply.
Regards,
Sankarsan
:-What Niranjan is saying that you club the functionalities of both schemasin one schema. This means let us say you want to go with ZQTA, then take the custom PCRs created in ZSJK and insert them in the appropriate place in ZQTA. That way only 1 schema will be used, which is the best practice.
First figure out why the need for 2 schemas. This will give you inputs when merging the schemas.
:-Hi PKverma,
Here payroll integration is present so I think I have to club ZQTA to ZSJK.
But I am not understanding how I will club this two.
Please advise.
Regards,
Sankarsan
:-Hi Sankarsan,
I have faced the same issue when you have positive time management and if
you use ZQTA (copy of TQTA) Then once you run the ZQTA , the quota will
generate properly and but the problem is that when you run the normal time
schema, the quota will become zero in IT2006.Also again if you run with
ZQTA, the system will properly calculate the Quota and same is available
with IT2006.
There is no solution for this problem as i have checked with ABAPer and
gone through the standard programand also checked with SAP. i was not
getting any solution. i have done the same thing what Mr.Niranjan has
already mentioned.
So you need to include all the PCRs mentioned in the schema ZQTA to your
schema ZSJK exactly the place where the Quota function is used.
The problem will get resolved.
Please try the same and let us know the result.
Thanks
Rajini
No comments:
Post a Comment